You are here:
  1. Home
  2. Case Studies
  3. The overall construction project of a group computer room in Beijing

The overall construction project of a group computer room in Beijing

Published 2020-11-04Date:2020-11

SANTAK 3C3PRO100K parallel machine. By parallel connection, two UPS share 50% of the load, and when one fails, the other automatically loads 100. To prevent a failure, the equipment without protection also increases the total load power.

SANTAK 3C3PRO100K and machine. On the using and on-line side, two units UPS shares 50% of the load, and when one unit fails, plus one unit automatically loads 100. To prevent a unit failure, the Standby is not protected and also increases the total load power.